olymmath

RU-SPB 2019 Problem 92

  • Grade 9

In the city built are 20192019 metro stations. Some pairs of stations are connected. tunnels, and from any station through the tunnels you can reach any other. The mayor ordered to organize several metro lines: each line should include several different stations connected in series by tunnels (several lines can pass through the same tunnel), and in each station must lie at least on one line. To save money no more than kk lines should be made. It turned out that the order of the mayor is not feasible. What is the largest kk it could to happen?

Dataset text AI-MO AoPS. Quoted with source.

Solutions

No solution is on olymmath yet. Official and human solutions come first when they arrive. AI solutions come after them, with a label.

Add a solution

Similar problems

These problems have the most words in common with this statement.

Locator ru-spb/2019/p92 · Tag XJKJW3SH0T · Edit this page on GitHub · Keys: j next, k previous