AMC 8 1990 Problem 17
- Paper
A straight concrete sidewalk is to be feet wide, feet long, and inches thick. How many cubic yards of concrete must a contractor order for the sidewalk if concrete must be ordered in a whole number of cubic yards?
Dataset text NuminaMath-1.5. Quoted with source.
Show the answer
2